CAPE EDMONT


630c52e8-12c8-406e-a130-033061f3b000.JPG
Year Built
1971
Official Number
901128
Shipyard
Eriksbergs Mekaniska Verkstads A/B
General Type
Roll On - Roll Off (RO/RO)
Specific Type
Roll On/Roll Off
MARAD Type
--
Ship Length
652.50 feet
Beam
94.00 feet
Mast Height
150.00 feet
Net Tons
7373.00 tons
Gross Tons
12902.00 tons
Cargo Capacity
121400.00 square feet
Draft, Summer
31.46 tons
Draft, Lightweight
13.50 tons
Displacement, Summer
32516.00 tons
Displacement, Lightweight
12000.00 tons
Immersion, Summer
115.00 tons
Immersion, Lightweight
87.00 tons
Fate
Still in Govt. Service

Historical Narrative



There is no historical narrative for this vessel at this time.

Vessel Name History

1971 - 1987: Paralla
1987 - present: Cape Edmont


Vessel Name History

CAPE EDMONT

PARALLA

Mission
Mission Name
Operation Enduring Freedom/Iraqi Freedom
Historical Documents

No documents for this vessel


Milestones


Event Date Content
Ship Name Change
2/24/1987 Ship PARALLA changes name to CAPE EDMONT
Entry
4/16/1987
Acquisition
4/16/1987
Vessel Activation
2/1/1988 Commence Sea Trial.
Vessel Activation
2/4/1988 Completed successful Sea Trial.
Vessel Activation
8/10/1990 Operation "Desert Storm" mission.
Vessel Activation
8/24/1990 Completed Operation "Desert Storm" mission.
Vessel Activation
3/21/1997 Conducting sea trial; TURBO ACT 97-1
Vessel Activation
3/22/1997 Completed sea trial; TURBO ACT 97-1
Interim Movement
11/12/1997 ENRTE: Charleston SC layberth
Interim Movement
11/14/1997 At new homeport at CNSY in Charleston
Vessel Activation
9/20/1998 No-Notice Turbo Activation 98-5
Vessel Activation
9/22/1998 Completed Turbo Activation
Interim Movement
11/29/1998 Hurricane Relief OPS/MSC OPCON 11/29/98
Interim Movement
11/29/1998 Loading supplys for Hurricane Relief OPS
Interim Movement
12/5/1998 ENRTE: Nicaragua via Panama Canal
Interim Movement
12/9/1998 Transiting Panama Canal enrte: Nicaragua
Interim Movement
12/10/1998 Exiting Panama Canal to Corinto Nicar.
Interim Movement
12/12/1998
Interim Movement
12/14/1998 ENRTE: Acajutla El Salvador
Interim Movement
12/14/1998
Interim Movement
12/15/1998 ENRTE: Balboa Anchorage Panama
Interim Movement
12/18/1998 Transiting Panama Canal
Interim Movement
12/26/1998 Exiting Panama Canal for Mobile AL
Interim Movement
12/30/1998 Loading cargo for Hurrican Relief OPS
Interim Movement
1/6/1999 ENRTE: Puerto Cortes Honduras
Interim Movement
1/8/1999 Discharging cargo
Interim Movement
1/10/1999 ENRTE: Panama Canal
Interim Movement
1/12/1999 Transiting Panama Canal
Interim Movement
1/13/1999 Exiting Panama Canal to Puerto Quetzal
Interim Movement
1/16/1999 Backloading cargo
Interim Movement
1/18/1999 ENRTE: Acajutla El Salvador
Interim Movement
1/18/1999
Interim Movement
1/20/1999 ENRTE: Wilmington NC via Panama Canal
Interim Movement
1/23/1999 Transiting the Panama Canal
Interim Movement
1/24/1999 Exiting the Panama Canal to Wilmington
Interim Movement
1/28/1999 Discharging and loading cargo
Interim Movement
2/1/1999 ENRTE: Corinto Nicar. via Panama Canal
Interim Movement
2/5/1999 Transiting Panama Canal
Interim Movement
2/6/1999 Exiting Panama Canal
Interim Movement
2/7/1999
Interim Movement
2/10/1999 ENRTE: Beaumont TX via Panama Canal
Interim Movement
2/12/1999 Transiting Panama Canal
Interim Movement
2/13/1999 Exiting Panama Canal to Beaumont TX
Interim Movement
2/17/1999
Interim Movement
2/20/1999 ENRTE: Charleston SC
Interim Movement
2/23/1999 Relief OPS completed/MARAD OPCON
Interim Movement
1/26/2000 "Temporary pier shift to pier ""Zulu"""
Interim Movement
1/26/2000 "Completed temporary shift to pier ""Zulu"""
Interim Movement
2/17/2000 "Shifting back to pier ""Tango"""
Interim Movement
2/17/2000 Completed pier shift
Interim Movement
3/11/2000 OPS to Savannah GA on SEDRE Exercise
Interim Movement
3/12/2000 ETD 3/15/00
Interim Movement
3/14/2000 ENRTE: Port Hueneme CA
Interim Movement
3/27/2000 Discharging cargo w/ETD 04/01/00
Interim Movement
3/31/2000 ENRTE: Charleston SC w/ETA 04/13/00
Interim Movement
4/13/2000 Completed exercise/MARAD OPCON 04/15/00
Interim Movement
8/1/2000 ENRTE: Detyens S/Y
Interim Movement
8/1/2000 At Detyens S/Y
Interim Movement
9/6/2000 Conducting sea trial to layberth
Interim Movement
9/8/2000 Sea Trial aborted due to vessel problems
Vessel Activation
10/12/2000 Conducting sea trial
Vessel Activation
10/13/2000 Completed sea trial
Vessel Activation
8/26/2002 Turbo Activation 02-02 sea trial
Vessel Activation
8/29/2002 Completed Turbo Activation 02-02 S/T
Vessel Activation
1/24/2003 Activation in support of Operation Iraqi Freedom.
Interim Movement
5/21/2003 End OP IRAQI FREEDOM|MARAD OPCON 5/21/03
Interim Movement
12/17/2003 "At Naval Weapons Station Charleston ""TC"""
Vessel Activation
1/1/2004 Commencing OIF II | MSC OPCON 12/17/03
Vessel Activation
6/14/2004 Completed activation mission in support of OIF 2
Vessel Activation
11/27/2004 Conducting sea trial for OIF
Vessel Activation
11/27/2004 Completed sea trial | MSC OPCON
Interim Movement
11/30/2004 Commencing OIF
Vessel Activation
2/22/2005 Returned from OIF | MARAD OPCON 02/23/05
Interim Movement
8/12/2005 ENRTE: Detyens S/Y for drydocking
Interim Movement
8/12/2005 At Detyen's S/Y for drydocking
Vessel Activation
3/28/2006 Conducting sea trial
Vessel Activation
6/1/2007 OIF mission.
Vessel Activation
6/14/2007 Conducting notice activation sea trial.
Vessel Activation
6/15/2007 "Completed sea trial at NWS Charleston, SC and COMSEALOGLANT OPCON."
Vessel Activation
6/15/2007 Completed OIF mission.
Depart
6/19/2007 "Commencing OIF 07-9 from NWS Charleston, SC."
Arrival
9/4/2007 "At NWS Charleston, SC."
Depart
9/5/2007 "Returning to ROS berth in Charleston, SC."
Arrival
9/5/2007 "Completed OIF 07-9 and MARAD OCPON at Charleston, SC."
Vessel Activation
4/21/2010 No Notice Turbo Activation. TA-10-03
Vessel Activation
4/25/2010 Completed Turbo Activation.
Vessel Activation
9/17/2013 Conducting maintenance sea trial.
Vessel Activation
9/20/2013 Completed sea trial.
Vessel Activation
4/7/2015 Conducting no notice turbo activation sea trial.
Vessel Activation
4/7/2015 No Notice Turbo Activation. TA-15-1
Vessel Activation
4/12/2015 Completed Turbo Activation.
Vessel Activation
4/14/2015 Completed turbo activation.
Vessel Activation
5/17/2016 Regulatory dry dock.
Vessel Activation
11/7/2016 Post maintenance sea trial.
Vessel Activation
11/14/2016 Completed post maintenance sea trial.

Ship Imagery




Status Cards



Documents


No documents for this vessel


Plans


No documents for this vessel


Shipwreck Information


No ship wreck information for this vessel