CAPE ISABEL (AKR-5062)


aebdd069-6e4f-4d0e-b8d1-544a384006c0.jpg
Cape Isabel underway. Date and location unknown. MARAD photo.
Year Built
1976
Official Number
577636
Shipyard
Bath Iron Works Corporation
General Type
Roll On - Roll Off (RO/RO)
Specific Type
Roll On/Roll Off
MARAD Type
C7-S-95a
Ship Length
685.00 feet
Beam
102.00 feet
Mast Height
--
Net Tons
--
Gross Tons
13156.00 tons
Cargo Capacity
--
Draft, Summer
32.00 tons
Draft, Lightweight
--
Displacement, Summer
36355.00 tons
Displacement, Lightweight
16007.00 tons
Immersion, Summer
--
Immersion, Lightweight
--
Fate
Still in Govt. Service

Historical Narrative



There is no historical narrative for this vessel at this time.

Vessel Name History

1976 - 1979: Nevada
1976 - 1986: Charles Lykes
1986 - present: Cape Isabel (AKR-5062)


Vessel Name History

CAPE ISABEL (AKR-5062)

CHARLES LYKES

NEVADA

Mission
Mission Name
Operation Enduring Freedom/Iraqi Freedom
Operations Desert Shield/Storm/Sortie
Historical Documents
Name Download
C7-S-95a Small Scale.pdf Default Generic Download Image
C7-S-95a Ship Loading Characteristics Pamphlet.pdf Default Generic Download Image

Milestones


Event Date Content
Acquisition
3/20/1986
Ship Name Change
6/9/1986 Ship CHARLES LYKES changes name to CAPE ISABEL
Entry
6/9/1986
Vessel Activation
8/10/1990 Operation "Desert Storm" mission.
Vessel Activation
8/21/1990 Completed Operation "Desert Storm" mission.
Vessel Activation
9/7/1993 Conducted Sea Trial.
Vessel Activation
9/10/1993 Completed Sea Trial.
Vessel Activation
8/12/1994 JRTC Cargo Lift in Hawaii.
Vessel Activation
8/29/1994 Completed JRTC Cargo Lift.
Vessel Activation
3/19/1998 Conducting acitvation sea trial. TA-98-1
Vessel Activation
3/20/1998 Completed activation sea trial
Vessel Activation
9/10/1998 No-Notice Turbo Activation 98-4
Vessel Activation
9/11/1998 Completed Turbo Activation
Vessel Activation
11/13/1999 Conducting sea trial and PRX exe
Vessel Activation
11/14/1999 Complete sea trial and PRX exercise
Vessel Activation
8/3/2000 Turbo Activation TA00-3 sea trial
Vessel Activation
8/4/2000 Completed Turbo Activation TA00-3
Interim Movement
3/6/2001 ENRTE: San Diego CA / MSC OPCON 3/5/01
Interim Movement
3/7/2001 At 10th Ave. Berth 2 San Diego CA
Interim Movement
3/8/2001 ENRTE: Pearl Harbor to load cargo
Interim Movement
3/13/2001
Interim Movement
3/17/2001 ENRTE: Iwakuni Japan w/ ETA 03/26/01
Interim Movement
3/26/2001 Loading in Iwakini
Interim Movement
3/29/2001 ENRTE: Tengan Japan
Interim Movement
4/1/2001 Loading at Tengan
Interim Movement
4/3/2001 ENRTE: Naha Japan
Interim Movement
4/3/2001
Interim Movement
4/5/2001 ENRTE: Pusan South Korea
Interim Movement
4/7/2001
Interim Movement
4/8/2001 ENRTE: Gladstone Australia ETA 04/17/01
Interim Movement
4/17/2001 Dicharging cargo
Interim Movement
4/19/2001 ENRTE: Long Beach CA w/ETA 05/06/01
Interim Movement
5/5/2001 Drydocked Cascade General SY| MARADOPCON
Vessel Activation
5/18/2001 Conducting sea trial to Long Beach CA
Vessel Activation
5/20/2001 Completed sea trial from drydock
Vessel Activation
8/27/2002 Turbo Activation 02-02 sea trial
Vessel Activation
8/30/2002 Completed Turbo Activation 02-02 S/T
Vessel Activation
1/24/2003 Activation in support of Operation Iraqi Freedom.
Interim Movement
1/29/2003 OP ENDURING FREEDOM | MSC OPCON 01/28/03
Interim Movement
5/12/2003 Return from OP IRAQI FREEDOM
Interim Movement
2/13/2004 Commencing OIF II | MSC OPCON 02/12/04
Interim Movement
7/10/2004 Returned from OIF II | MARAD OCPON
Vessel Activation
3/24/2008 No Notice Turbo Activation. TA-08-02
Vessel Activation
3/28/2008 "Conducting Turbo Activation sea trial from Long Beach, CA at 1045PDT."
Vessel Activation
3/29/2008 Completed Turbo Activation.
Vessel Activation
9/23/2009 No Notice Turbo Activation. TA-09-4B
Vessel Activation
9/28/2009 Completed Turbo Activation.
Vessel Activation
9/23/2013 No Notice Turbo Activation. TA-13-7
Vessel Activation
9/27/2013 Completed Turbo Activation.
Vessel Activation
7/27/2015 No notice turbo activation sea trial. TA-15-03
Vessel Activation
8/2/2015 Completed turbo activation.
Vessel Activation
8/22/2016 Transit to shipyard and post drydock maintenance sea trial.
Vessel Activation
8/25/2016 Completed post drydock maintenance sea trial.

Ship Imagery




Status Cards



Documents


Date Type Name Download
10/7/2016 Historical C7-S-95a Small Scale.pdf Default Generic Download Image
1/1/1988 Historical C7-S-95a Ship Loading Characteristics Pamphlet.pdf Default Generic Download Image

Plans


No documents for this vessel


Shipwreck Information


Vessel Information
Owner
--

Operator
--

Operator Agreement
Unknown

Flag State
--

Incident Information
Incident Date
--

Use at Loss
--

Cause
Still in Govt. Service

Cause Comments
--

Conflict
--

Location of Incident
--

Accuracy of Incident Location
--

Lat/Long
--

Incident Location Comments
--

Lives Lost
--