CAPE RAY


39faf36c-7f67-4e12-ad00-6d5c9390a58b.JPEG
Year Built
1977
Official Number
993577
Shipyard
Kawasaki Heavy Industries
General Type
Roll On - Roll Off (RO/RO)
Specific Type
Roll On/Roll Off
MARAD Type
--
Ship Length
648.00 feet
Beam
105.64 feet
Mast Height
152.50 feet
Net Tons
7514.00 tons
Gross Tons
14825.00 tons
Cargo Capacity
132209.00 square feet
Draft, Summer
32.81 tons
Draft, Lightweight
14.40 tons
Displacement, Summer
35358.00 tons
Displacement, Lightweight
12989.00 tons
Immersion, Summer
125.00 tons
Immersion, Lightweight
88.00 tons
Fate
Still in Govt. Service

Historical Narrative



There is no historical narrative for this vessel at this time.

Vessel Name History

1977 - 1981: Seaspeed Asia
1981 - 1994: Saudi Makkah
1994 - present: Cape Ray

Photo Captions

Photo 1: A port quarter view of the Ready Reserve Force (RRF) vehicle transport ship CAPE RAY (T-AKR-6663) tied up at the Moon Engineering Company near Norfolk, Va. Photograph taken August 26, 1994.  Image courtesy of US Navy.

Photo 2: The bow and forcastle deck of Cape Ray.  Maritime Administration image.


Vessel Name History

CAPE RAY

SAUDI MAKKAH

Mission
Mission Name
Operation Enduring Freedom/Iraqi Freedom
Historical Documents
Name Download
CAPE Ray Construction Profile and Deck Plan.pdf Default Generic Download Image
CAPE Ray Design Presentation.pdf Default Generic Download Image

Milestones


Event Date Content
Acquisition
4/29/1993
Entry
5/4/1993 Entered James River Reserve Fleet
Vessel Name Change
2/1/1994 Vessel name changed from SAUDI MAKKAH to CAPE RAY
Vessel Activation
3/11/1997 Conducting sea trial
Vessel Activation
3/13/1997 Completed sea trial
Interim Movement
8/31/1998 ENRTE: Baltimore Marine Inc.
Interim Movement
9/1/1998 At Baltimore Marine Inc. for stern ramp
Vessel Activation
11/3/1998 Conducting sea trial to Portsmouth VA
Vessel Activation
11/5/1998 Completed sea trial at ROS outport berth
Interim Movement
1/13/1999 ENRTE: N. Florida S/Y in Jacksonville FL
Interim Movement
1/15/1999 At N. Florida S/Y for spar desk install
Interim Movement
4/19/1999 ENRTE: Moon Engineering in Portsmouth VA
Interim Movement
4/21/1999 Return after spar deck install at NFLSY
Interim Movement
7/8/1999 Under tow to BMI B'more MD w/ETA 7/9/99
Interim Movement
7/9/1999 At BMI for drydocking
Vessel Activation
9/10/1999 Conducting maintenance sea trial
Vessel Activation
9/12/1999 Completed sea trial to layberth
Vessel Activation
7/11/2000 Conducting Maintenance Activation S/T
Vessel Activation
7/13/2000 Completed Maintenance Activation S/T
Vessel Activation
12/21/2000 Turbo Activation 01-02 sea trial
Vessel Activation
12/22/2000 Completed Turbo Activation 01-02 S/T
Vessel Activation
10/3/2001 Turbo Activation 01-06 sea trial
Vessel Activation
10/4/2001 Completed Turbo Activation 01-06 S/T
Vessel Activation
8/27/2002 Turbo Activation 02-02 sea trial
Vessel Activation
8/29/2002 Completed Turbo Activation 02-02 S/T
Vessel Activation
11/19/2002 Conducting sea trial
Vessel Activation
11/22/2002 Completed sea trial
Vessel Activation
1/24/2003 Activation in support of Operation Iraqi Freedom.
Vessel Activation
5/17/2003 End OP IRAQI FREEDOM|MARAD OPCON 5/16/03
Vessel Activation
12/22/2004 Activating for OIF | MSC OPCON 12/06/04
Vessel Activation
3/30/2005 Returned from OIF | MARAD OPCON
Vessel Activation
9/18/2006 No Notice Turbo Activation. TA-06-05
Vessel Activation
9/23/2006 Completed Turbo Activation.
Vessel Activation
9/26/2008 No Notice Turbo Activation. TA-08-05
Vessel Activation
10/1/2008 Completed Turbo Activation.
Vessel Activation
11/19/2013 Activated to support OPCW.
Vessel Activation
9/17/2014 Completed mission and returned to Portsmouth, VA.
Vessel Activation
6/20/2015 Conducting post drydock maintenance sea trial.
Vessel Activation
6/23/2015 Completed sea trial.

Ship Imagery




Status Cards



Documents


Date Type Name Download
1/16/1976 Historical CAPE Ray Construction Profile and Deck Plan.pdf Default Generic Download Image
1/1/1976 Historical CAPE Ray Design Presentation.pdf Default Generic Download Image

Plans


Date Type Name Download
(No Date) Cape Ray Construction and Load Plan .pdf Default Generic Download Image

Shipwreck Information


No ship wreck information for this vessel