AMERICAN BUILDER


50e5bdde-58f4-4017-9723-fb164f4795b9.jpg
Year Built
1962
Official Number
287238
Shipyard
Todd Shipbuilding and Drydock
General Type
Dry Bulk
Specific Type
Dry Bulk
MARAD Type
C6-S-1x
Ship Length
668.00 feet
Beam
76.00 feet
Mast Height
--
Net Tons
--
Gross Tons
16518.00 tons
Cargo Capacity
--
Draft, Summer
--
Draft, Lightweight
--
Displacement, Summer
--
Displacement, Lightweight
--
Immersion, Summer
--
Immersion, Lightweight
--
Fate
Sold - Scrap

Historical Narrative



There is no historical narrative for this vessel at this time.

Vessel Name History

1962 - 1975: Washington Mail
1975 - 1983: President Roosevelt
1983 - 1985: Santa Rosa
1985 - 1989: American Builder
1989 - present: Equality State

Photo Captions

1.) American Builder, in port.  MARAD file photo.  Date unknown.


Vessel Name History

AMERICAN BUILDER

EQUALITY STATE

WASHINGTON MAIL

Mission

No Mission for this vessel

Historical Documents
Name Download

Milestones


Event Date Content
Disposition
10/9/1973
Withdrawl
10/9/1973
Acquisition
3/10/1987 Acquired as a TACS candidate
Entry
3/30/1987
Acquisition
3/30/1987 ex SANTA ROSA
Interim Movement
5/24/1989
Interim Movement
5/29/1997 ENRTE: Tow to Bender Shipyard in Mobile
Interim Movement
6/2/1997 At Bender Shipyard for drydocking
Interim Movement
7/12/1997 ENRTE: Outport in Houston TX
Interim Movement
7/14/1997 At outport
Interim Movement
5/21/1998 ENRTE: Houston Ship Repair
Interim Movement
5/21/1998 At Houston Ship Repair
Interim Movement
7/29/1998 ENRTE: Port of Houston after repair work
Interim Movement
7/29/1998 Returned to Port of Houston after repair
Interim Movement
9/13/1998 No-Notice Turbo Activation 98-4
Interim Movement
9/17/1998 Completed Turbo Activation/Begin repairs
Interim Movement
7/21/1999 ENRTE: Rosevelt Roads PR for MSC OPS
Interim Movement
7/25/1999 At Roosevelt Roads PR/MSC OPCON 7/21/99
Interim Movement
7/30/1999 ENRTE: Houston TX
Interim Movement
8/3/1999 Complete MSC OPS / MARAD OPCON 08/04/99
Interim Movement
8/1/2000 Turbo Activation TA00-3 sea trial
Interim Movement
8/3/2000 Completed Turbo Activation TA00-3
Interim Movement
5/28/2001 Conducting TA-01-03 Sea Trial
Interim Movement
5/30/2001 Completed TA-01-03 Sea Trial
Interim Movement
11/30/2001 Conducting maintenance sea trial
Interim Movement
12/2/2001 Completed maintenance sea trial
Interim Movement
9/16/2002 Turbu Activation 02-03 S/T to Tampa FL
Interim Movement
9/19/2002 Completed Turbo Activation 02-03 S/T
Interim Movement
12/22/2002 ENRTE: City Docks outport berth
Interim Movement
12/23/2002 Returned from deactivation
Interim Movement
11/21/2003 Conducting maintenance sea trial
Interim Movement
11/23/2003 Completed sea trial

Ship Imagery




Status Cards



Documents


Date Type Name Download
(No Date) AMERICAN BUILDER.pdf Default Generic Download Image

Plans


No documents for this vessel


Shipwreck Information


No ship wreck information for this vessel