AMERICAN DRACO
Year Built
1965
Official Number
299008
Shipyard
Ingalls Shipbuilding Corporation
General Type
Container
Specific Type
Combination Roll On - Roll Off (ConRo)
MARAD Type
C6-5-60b
Ship Length
665.80 feet
Beam
75.00 feet
Mast Height
--
Net Tons
--
Gross Tons
105999.00 tons
Cargo Capacity
--
Draft, Summer
31.56 tons
Draft, Lightweight
--
Displacement, Summer
--
Displacement, Lightweight
--
Immersion, Summer
--
Immersion, Lightweight
--
Fate
Unknown
Historical Narrative
There is no historical narrative for this vessel at this time.
Vessel Name History
1965 - 1983: Mormacdraco
1983 - 1989: American Draco
1989 - 2009: Beaver State (T-ACS-10)
2009 - present: Pacific Tracker
Vessel Name History
Mission
No Mission for this vessel
Historical Documents
No documents for this vessel
Milestones
Event | Date | Content |
---|---|---|
Entry
| 3/10/1986 | |
Acquisition
| 3/10/1986 | SEE-BEAVER STATE |
Interim Movement
| 4/15/1997 | ENRTE: BRF |
Interim Movement
| 4/17/1997 | |
Interim Movement
| 4/26/1997 | Comducting sea trial to Port Arthur TX |
Interim Movement
| 4/28/1997 | Competed sea trial |
Interim Movement
| 5/4/1997 | ENRTE: Portland OR |
Interim Movement
| 5/22/1997 | |
Interim Movement
| 5/23/1997 | ENRTE: Portland OR outport facility |
Interim Movement
| 5/25/1997 | At new outport facility & new homeport |
Interim Movement
| 11/20/1999 | ENRTE: Bremerton |
Interim Movement
| 11/22/1999 | At new homeport in Bremerton WA |
Interim Movement
| 7/6/2000 | Tow to Olympia WA for repairs |
Interim Movement
| 7/6/2000 | In for repairs |
Interim Movement
| 9/8/2000 | Conducting bay trial to Bremerton |
Interim Movement
| 9/9/2000 | Returned from shipyard |
Interim Movement
| 11/8/2000 | Conducting maintenance sea trial |
Interim Movement
| 11/9/2000 | At Todd S/Y for repairs during sea trial |
Interim Movement
| 11/12/2000 | Recommencing sea trial |
Interim Movement
| 11/13/2000 | Completed maintenance sea trial |
Interim Movement
| 10/2/2001 | Turbo Activation 01-04 sea trial |
Interim Movement
| 10/3/2001 | Completed Turbo Activation 01-04 S/T |
Interim Movement
| 8/26/2002 | Turbo Activation 02-02 sea trial |
Interim Movement
| 8/30/2002 | Completed Turbo Activation 02-02 S/T |
Interim Movement
| 1/10/2003 | ENRTE: Cascade General S/Y for drydock |
Interim Movement
| 1/11/2003 | In for drydocking |
Interim Movement
| 2/19/2003 | ENRTE: Tacoma WA for maintenance act/ST |
Interim Movement
| 2/21/2003 | Completed maintenance sea trial |
Interim Movement
| 5/8/2003 | ENRTE: Bremerton WA |
Interim Movement
| 5/8/2003 | Returned from repairs |
Ship Imagery
No images for this vessel
Status Cards
Documents
No documents for this vessel
Plans
No documents for this vessel
Shipwreck Information
No ship wreck information for this vessel