PETERSBURG


f217ae2c-055d-4f84-88a0-79008ea7434c.jpg
Year Built
1963
Official Number
291990
Shipyard
Bethlehem-Sparrows Point Shipyard
General Type
Tanker
Specific Type
LNG Liquefied Natural Gas
MARAD Type
--
Ship Length
736.00 feet
Beam
102.00 feet
Mast Height
--
Net Tons
18685.00 tons
Gross Tons
27469.00 tons
Cargo Capacity
174900.00 barrels
Draft, Summer
39.70 tons
Draft, Lightweight
--
Displacement, Summer
61674.00 tons
Displacement, Lightweight
12681.00 tons
Immersion, Summer
--
Immersion, Lightweight
--
Fate
Still in Govt. Service

Historical Narrative



There is no historical narrative for this vessel at this time.

Vessel Name History

1963 - 1981: Sinclair Texas
1981 - present: Petersburg

Photo Captions

1.) Petersburg, underway.  MARAD file photo.
2.) Peterburg, with OPDS SALM barge deployed.  MARAD file photo.
3.) Petersburg, underway.  MARAD file photo.
4.) Petersburg, underway.  MARAD file photo.
5.) Petersburg, underway.  MARAD file photo.


Vessel Name History

PETERSBURG

SINCLAIR TEXAS

Mission
Mission Name
Operation Enduring Freedom/Iraqi Freedom
Historical Documents

No documents for this vessel


Milestones


Event Date Content
Ship Name Change
7/27/1981 Ship SINCLAIR TEXAS changes name to PETERSBURG
Acquisition
12/15/1987 "OPDS 4, ex SINCLAIR TEXAS"
Entry
1/11/1988
Vessel Activation
5/12/1997 Conducting sea trial to Port Arthur TX
Vessel Activation
5/15/1997 Completed sea trial at ROS layberth
Vessel Activation
5/28/1997 Conducting sea trial
Vessel Activation
5/30/1997 Completed sea trial at ROS layberth
Interim Movement
10/26/1997 ENRTE: Bender Shipyard fro drydocking
Interim Movement
10/29/1997 At Bender Shipyard for drydocking
Interim Movement
12/10/1997 ENRTE: Outport berth in Orange TX
Interim Movement
12/13/1997 At outport berth in Orange TX
Vessel Activation
8/4/1998 Conducting sea trial w/EDT 08/08/98
Vessel Activation
8/7/1998 Completed sea trial
Interim Movement
9/4/1998 ENRTE: Port Arthur TX for bunkering
Interim Movement
9/4/1998 In for bunkers / MSC OPCON 09/06/98
Interim Movement
9/5/1998 ENRTE: Port Arthur / Completed bunkering
Interim Movement
9/5/1998
Interim Movement
9/6/1998 ENRTE: Pearl Harbor / MSC OPCON / New HP
Interim Movement
9/25/1998 In for OPDS support equipment for APF
Interim Movement
9/28/1998 ENRTE: Pohang South Korea/FOAL EAGLE EX
Interim Movement
10/11/1998 In Pohang South Korea for FOAL EAGLE EX
Interim Movement
11/9/1998 ENRTE: Ulsan South Korea
Interim Movement
11/10/1998
Interim Movement
11/12/1998 ENRTE: Guam
Interim Movement
11/17/1998
Vessel Activation
2/10/1999 Conducting sea trial
Vessel Activation
2/11/1999 Completed sea trial
Interim Movement
2/16/1999 Conducting ISE
Interim Movement
2/18/1999 Completed ISE
Interim Movement
3/15/1999 Conducting ISE w/ ETA 03/17/99
Interim Movement
3/17/1999 Completed ISE
Interim Movement
4/22/1999 Conducting ISE
Interim Movement
4/24/1999 Completed ISE
Interim Movement
5/19/1999 Conducting ISE
Interim Movement
5/21/1999 Completed ISE
Interim Movement
7/12/1999 Conducting ISE
Interim Movement
7/13/1999 Completed ISE
Interim Movement
8/18/1999 Conducting ISE
Interim Movement
8/20/1999 Completed ISE
Interim Movement
9/20/1999 Conducting ISE w/ETA 09/22/99
Interim Movement
9/22/1999 Completed ISE
Interim Movement
10/22/1999 Conducting ISE
Interim Movement
10/25/1999 Completed ISE
Interim Movement
11/8/1999 Conducting ISE
Interim Movement
11/10/1999 Completed ISE
Interim Movement
12/12/1999 Conducting ISE
Interim Movement
12/15/1999 Completed ISE
Interim Movement
1/25/2000 Conducting ISE
Interim Movement
1/26/2000 Completed ISE
Interim Movement
2/15/2000 Conducting ISE to Okinawa Japan
Interim Movement
2/19/2000 Completed ISE at Okinawa
Interim Movement
2/22/2000 ENRTE: Guam w/ETA 02/26/2000
Interim Movement
2/26/2000
Interim Movement
5/10/2000 Conducting ISE
Interim Movement
5/12/2000 Completed ISE
Interim Movement
6/1/2000 ENRTE: Hakozaki Yokosuku
Interim Movement
6/6/2000 Dicharging JP-5
Interim Movement
6/8/2000 ENRTE: Akasaki fuel terminal Sasebo JA
Interim Movement
6/8/2000 At Akasaki fuel terminal
Interim Movement
6/9/2000 ENRTE: Singapore w/ ETA 06/19/00
Interim Movement
6/21/2000 In for drydocking and ABS inspection
Interim Movement
8/8/2000 ENRTE: Ulsan Korea
Interim Movement
8/16/2000
Interim Movement
8/20/2000 ENRTE: Guam
Interim Movement
8/25/2000 Returned from drydocking
Interim Movement
9/6/2000 Conducting ISE
Interim Movement
9/8/2000 Completed ISE
Interim Movement
9/20/2000 Conducting ISE
Interim Movement
9/21/2000 Completed ISE
Interim Movement
10/29/2000 Conducting ISE
Interim Movement
10/31/2000 Completed ISE
Interim Movement
11/28/2000 Underway for Spec Ops Training
Interim Movement
12/1/2000 Completed ISE
Interim Movement
1/22/2001 Conducting ISE
Interim Movement
1/24/2001 Completed ISE
Interim Movement
3/13/2001 Conducting ISE
Interim Movement
3/15/2001 Completed ISE
Interim Movement
4/16/2001 Conducting ISE
Interim Movement
4/17/2001 Completed ISE
Interim Movement
6/13/2001 Conducting ISE
Interim Movement
6/16/2001 Completed ISE
Interim Movement
8/21/2001 ENRTE: Okinawa
Interim Movement
8/25/2001
Interim Movement
8/29/2001 ENRTE: Guam w/ETA 09/02/01
Interim Movement
9/2/2001
Interim Movement
9/18/2001 Conducting ISE
Interim Movement
9/20/2001 Completed ISE
Interim Movement
10/15/2001 Conducting ISE
Interim Movement
10/16/2001 Completed ISE
Interim Movement
10/28/2001 Conducting ISE
Interim Movement
11/5/2001 Completed ISE
Interim Movement
12/12/2001 Conducting ISE
Interim Movement
12/13/2001 Completed ISE
Interim Movement
1/16/2002 Conducting ISE
Interim Movement
1/18/2002 Completed ISE
Interim Movement
2/13/2002 Conducting ISE
Interim Movement
2/15/2002 Completed ISE
Interim Movement
4/2/2002 Conducting ISE
Interim Movement
4/4/2002 Completed ISE
Interim Movement
4/17/2002 Conducting ISE
Interim Movement
4/18/2002 Completed ISE
Interim Movement
5/27/2002 Conducting ISE
Interim Movement
5/29/2002 Completed ISE
Interim Movement
6/18/2002 Conducting ISE
Interim Movement
6/20/2002 Completed ISE
Interim Movement
7/4/2002 Underway for Typhoon Chataan evasion
Interim Movement
7/8/2002 Returned from Typhoon Chataan evasion
Interim Movement
7/9/2002 Underway for Tyhpoon Halong evasion
Interim Movement
7/13/2002 Returned from Typhoon Halong evasion
Interim Movement
10/11/2002 Conducting ISE
Interim Movement
10/14/2002 Completed ISE
Interim Movement
12/8/2002 Underway Super Typhoon Pongsona sortie
Interim Movement
12/16/2002 Return from Typhoon sortie to ECHO Wharf
Interim Movement
12/17/2002 Shifting to anchorage
Interim Movement
12/17/2002 Completed shift to anchorage
Interim Movement
12/19/2002 Shifting back to ECHO Wharf
Interim Movement
12/19/2002 Completed shift back to ECHO Wharf
Interim Movement
1/2/2003 ENRTE: Okinawa Japan
Interim Movement
1/6/2003 At anchorage for USMC training ex.
Interim Movement
1/9/2003 ENRTE: Pusan Korea for bunkering
Interim Movement
2/10/2003 Conducting ISE
Interim Movement
2/14/2003 Completed ISE
Arrival
12/12/2007 "At Alameda, CA ROS Berth and tendered to MARAD OPCON 12/13."
Vessel Activation
1/15/2010 No notice activation in support of Haitian earthquake relief operations.
Vessel Activation
2/14/2010 Completed activation in support of Haitian earthquake relief operations.
Interim Movement
8/1/2011 Late notice on ship movement from Alameda, CA to San Francisco, CA.

3/8/2012
Vessel Activation
9/25/2015 Conducting maintenance activation and sea trial.
Vessel Activation
9/30/2015 Completed sea trial.

Ship Imagery




Status Cards



Documents


No documents for this vessel


Plans


No documents for this vessel


Shipwreck Information


No ship wreck information for this vessel